{"id":58401,"date":"2026-11-17T17:44:26","date_gmt":"2026-11-17T11:59:26","guid":{"rendered":"https:\/\/nepalsamaj.com\/en\/?p=58401"},"modified":"2026-11-17T17:44:26","modified_gmt":"2026-11-17T11:59:26","slug":"nea-to-export-56-mw-and-import-350-mw-of-electricity-from-india","status":"publish","type":"post","link":"https:\/\/nepalsamaj.com\/en\/nea-to-export-56-mw-and-import-350-mw-of-electricity-from-india\/","title":{"rendered":"NEA to export 56 MW and import 350 MW of electricity from India"},"content":{"rendered":"<div style=\"margin-top: 0px; margin-bottom: 0px;\" class=\"sharethis-inline-share-buttons\" ><\/div><p>Kathmandu, Nov 17: The Nepal Electricity Authority (NEA) has received permission to import 350 megawatts (MW) of electricity from India during the upcoming winter season.<\/p>\n<p>The Central Electricity Authority, under India\u2019s Ministry of Power, has authorized the NEA to import electricity at competitive rates for up to 17 hours a day. According to the agreement between the two entities, the NEA is permitted to import electricity starting today until Shrawan 15 of the coming year. Specifically, imports are allowed during all hours except for the periods between 5:00 AM \u2013 8:00 AM and 5:00 PM \u2013 9:00 PM.<\/p>\n<p>Accordingly, 300 MW will be imported via the Kataiya\u2013Kushaha, Ramnagar\u2013Surajpura, and Raxaul\u2013Parwanipur 132 kV transmission lines, while 50 MW will be imported through the New Nautanwa\u2013Mainahiya 132 kV transmission line.<\/p>\n<p>NEA Executive Director Dirghayu Kumar Shrestha stated that the approval to import 350 MW from India will make it easier to manage electricity demand and supply during the upcoming winter season.<\/p>\n<p>Due to damage caused by floods in the Bhote Koshi river\u2014which affected hydropower projects and transmission lines\u2014projects with a combined installed capacity of 431 MW have been disconnected from the national power grid. Executive Director Shrestha noted that, in light of this situation, necessary preparations have been made to manage electricity demand and supply for the coming winter.<\/p>\n<p>Based on an analysis of last year\u2019s electricity demand and production, it is estimated that for the four months of Poush, Magh, Falgun, and Chaitra, electricity demand will exceed domestic production. It is estimated that, particularly during the months of Magh and Fagun, an average of 450 to 500 megawatts of electricity will need to be imported daily.<\/p>\n<p>Similarly, it is projected that during peak hours, when demand is at its highest, daily imports of 800 to 900 megawatts may be required.<\/p>\n<p>As river water flow is anticipated to gradually increase starting from the upcoming month of Baisakh, domestic electricity production is expected to rise; this will displace imports and pave the way for the export of electricity.<\/p>\n<p>Likewise, the NEA has received authorization to sell a total of 56 megawatts of electricity generated from three different hydropower projects on the Indian Energy Exchange (IEX).<\/p>\n<p>Permission to export electricity applies from today, continuing until the 15th of the month of Shrawan in the Lunar Calendar.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kathmandu, Nov 17: The Nepal Electricity Authority (NEA) has received permission to import 350 megawatts (MW) of electricity from India during the upcoming winter season. The Central Electricity Authority, under India\u2019s Ministry of Power, has authorized the NEA to import electricity at competitive rates for up to 17 hours a day. According to the agreement [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":34785,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16,1,11],"tags":[],"class_list":["post-58401","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy","category-main-news","category-national"],"_links":{"self":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/58401"}],"collection":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/comments?post=58401"}],"version-history":[{"count":1,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/58401\/revisions"}],"predecessor-version":[{"id":58402,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/58401\/revisions\/58402"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/media\/34785"}],"wp:attachment":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/media?parent=58401"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/categories?post=58401"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/tags?post=58401"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}