{"id":33430,"date":"2025-10-18T12:17:49","date_gmt":"2025-10-18T06:32:49","guid":{"rendered":"https:\/\/nepalsamaj.com\/en\/?p=33430"},"modified":"2025-10-18T12:17:49","modified_gmt":"2025-10-18T06:32:49","slug":"kaligandaki-corridor-motorable-bridge-constructed-over-setokhola-stream","status":"publish","type":"post","link":"https:\/\/nepalsamaj.com\/en\/kaligandaki-corridor-motorable-bridge-constructed-over-setokhola-stream\/","title":{"rendered":"Kaligandaki Corridor: Motorable bridge constructed over Setokhola stream"},"content":{"rendered":"<div style=\"margin-top: 0px; margin-bottom: 0px;\" class=\"sharethis-inline-share-buttons\" ><\/div><p>Myagdi, Oct 18: A motorable bridge has been constructed over the Setokhola stream in Thasang Rural Municipality\u20133, Mustang, under the Beni\u2013Jomsom\u2013Korala section of the Kali Gandaki Corridor roadway, a national pride project, connecting China and India.<br \/>\nThe Beni\u2013Jomsom\u2013Korala Road Project Office, Mustang has constructed a 25-metre-long motorable bridge. After the construction of the bridge, the need to ferry vehicles across the Setokhola River has ended.<\/p>\n<p>The Information Officer of the Project Office, Bishnu Chapagain, said that the 11-metre-wide RCC bridge has been constructed at a cost of Rs 63 million 579 thousand 696.<br \/>\nAccording to Chapagain, 13 out of the 24 motorable bridges that need to be constructed on the 202 kilometres long Beni\u2013Jomsom-Korala road have been completed.<\/p>\n<p>Engineer Chapagain stated that the construction of two additional motorable bridges over Kaihku and Kowang rivers in Thasang Rural Municipality has reached the final stage.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Myagdi, Oct 18: A motorable bridge has been constructed over the Setokhola stream in Thasang Rural Municipality\u20133, Mustang, under the Beni\u2013Jomsom\u2013Korala section of the Kali Gandaki Corridor roadway, a national pride project, connecting China and India. The Beni\u2013Jomsom\u2013Korala Road Project Office, Mustang has constructed a 25-metre-long motorable bridge. After the construction of the bridge, the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":33431,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[18,11],"tags":[],"class_list":["post-33430","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","category-national"],"_links":{"self":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/33430"}],"collection":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/comments?post=33430"}],"version-history":[{"count":1,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/33430\/revisions"}],"predecessor-version":[{"id":33432,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/33430\/revisions\/33432"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/media\/33431"}],"wp:attachment":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/media?parent=33430"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/categories?post=33430"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/tags?post=33430"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}