{"id":26845,"date":"2025-07-17T10:21:02","date_gmt":"2025-07-17T04:36:02","guid":{"rendered":"https:\/\/nepalsamaj.com\/en\/?p=26845"},"modified":"2025-07-17T10:21:02","modified_gmt":"2025-07-17T04:36:02","slug":"irrigation-service-expanded-in-52-hectares-of-land","status":"publish","type":"post","link":"https:\/\/nepalsamaj.com\/en\/irrigation-service-expanded-in-52-hectares-of-land\/","title":{"rendered":"Irrigation service expanded in 52 hectares of land"},"content":{"rendered":"<div style=\"margin-top: 0px; margin-bottom: 0px;\" class=\"sharethis-inline-share-buttons\" ><\/div><p>Myagdi, July 17: Irrigation service has been expanded to 52 hectares of land through the projects operated by the Drinking Water, Water Resource and Irrigation Development Division Office in the fiscal year 2081\/82 BS.<\/p>\n<p>Likewise, irrigation facilities have been upgraded in 70 hectares of land, the Division said.<br \/>\nDivision chief Jhalak Mohan Ojha informed that the irrigation facilities have been expanded and upgraded through the construction of six-kilometer cemented canal, five dams and 47 irrigation structures, and expansion of 6.11-km pipeline.<\/p>\n<p>Towards irrigation, a total budget of Rs 48.3 million has been allocated for 22 projects, of which 21 have been completed.<\/p>\n<p>Of the allocated amount for irrigation, 91.31 percent or Rs 44.1 million has been spent.<br \/>\nSimilarly, a 40-meter permanent wall and a 250-meter gabion wall have been constructed in six locations vulnerable to flooding and erosion through river control projects.<\/p>\n<p>In the Raghuganga-1 area, gabion construction has also been carried out to prevent landslides. A total of 110 families have benefited from river and landslide control projects, and 2.5 hectares of land have been reclaimed.<\/p>\n<p>Ojha informed that out of the allocated Rs 15 million for river control projects, Rs 14.7 million has been spent, he shared.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Myagdi, July 17: Irrigation service has been expanded to 52 hectares of land through the projects operated by the Drinking Water, Water Resource and Irrigation Development Division Office in the fiscal year 2081\/82 BS. Likewise, irrigation facilities have been upgraded in 70 hectares of land, the Division said. Division chief Jhalak Mohan Ojha informed that [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26846,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[],"class_list":["post-26845","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economy"],"_links":{"self":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/26845"}],"collection":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/comments?post=26845"}],"version-history":[{"count":1,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/26845\/revisions"}],"predecessor-version":[{"id":26847,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/26845\/revisions\/26847"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/media\/26846"}],"wp:attachment":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/media?parent=26845"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/categories?post=26845"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/tags?post=26845"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}