{"id":17384,"date":"2025-02-09T14:23:48","date_gmt":"2025-02-09T08:38:48","guid":{"rendered":"https:\/\/nepalsamaj.com\/en\/?p=17384"},"modified":"2025-02-09T14:23:48","modified_gmt":"2025-02-09T08:38:48","slug":"kaligandaki-corridor-construction-of-three-motorable-bridges-completed-in-mustang","status":"publish","type":"post","link":"https:\/\/nepalsamaj.com\/en\/kaligandaki-corridor-construction-of-three-motorable-bridges-completed-in-mustang\/","title":{"rendered":"Kaligandaki Corridor: Construction of three motorable bridges completed in Mustang"},"content":{"rendered":"<div style=\"margin-top: 0px; margin-bottom: 0px;\" class=\"sharethis-inline-share-buttons\" ><\/div><p>Myagdi, Feb 9: Three motorable bridges have been constructed along the Kaligandaki Corridor, a national pride project connecting China and India, on the Benighat\u2013Jomsom\u2013Korala road in Mustang.<\/p>\n<p>The Benighat\u2013Jomsom\u2013Korala Road Project Office, Mustang, has built motorable bridges over the Marphakhola in ward 2 of the Gharapjhong Rural Municipality, Nursingkhola in Baragung Muktikshetra Rural Municipality-6, and over the Charangkhol in the Damaodar Kunda Rural Municipality, at a cost of Rs 310.78 million.<br \/>\nThe project chief Dhruba Kumar Jha informed that the construction of the three bridges and access roads has been completed, allowing vehicles to operate. According to him, a contract worth Rs 210.6 million was signed six years ago with Himadung&amp;Thokar Immortal Construction for the construction of a 120-meter-long motorable bridge over the Marphakhola.<\/p>\n<p>After the permanent bridge was brought into operation, the problem of having to cross the river using a temporary wooden bridge and risking safety has been resolved, said Lomshang Chomphel Bista (Raju), the chairman of the Lhoghekar-Damodarkund Rural Municipality.<\/p>\n<p>Bista further shared that the road extension and bridge construction bids were underway along the road sections.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Myagdi, Feb 9: Three motorable bridges have been constructed along the Kaligandaki Corridor, a national pride project connecting China and India, on the Benighat\u2013Jomsom\u2013Korala road in Mustang. The Benighat\u2013Jomsom\u2013Korala Road Project Office, Mustang, has built motorable bridges over the Marphakhola in ward 2 of the Gharapjhong Rural Municipality, Nursingkhola in Baragung Muktikshetra Rural Municipality-6, and [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":17385,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1,11,18],"tags":[],"class_list":["post-17384","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-main-news","category-national","category-news"],"_links":{"self":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/17384"}],"collection":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/comments?post=17384"}],"version-history":[{"count":1,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/17384\/revisions"}],"predecessor-version":[{"id":17386,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/posts\/17384\/revisions\/17386"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/media\/17385"}],"wp:attachment":[{"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/media?parent=17384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/categories?post=17384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/nepalsamaj.com\/en\/wp-json\/wp\/v2\/tags?post=17384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}